In our articles, we’ve touched on two extremely important and necessary elements for your development – the Complying Development Certificate and Development Approval. However, we haven’t explored another integral piece of documentation needed to begin construction, the Construction Certificate (CC). In this article, we’ll expand on everything you need to know about the CC, including …

1 November, 2021
Everything you need to know about a Construction Certificate

In our articles, we’ve touched on two extremely important and necessary elements for your development – the Complying Development Certificate and Development Approval. However, we haven’t explored another integral piece of documentation needed to begin construction, the Construction Certificate (CC). In this article, we’ll expand on everything you need to know about the CC, including why it’s key for materialising your plans and how you can acquire them.

First, what is a Construction Certificate?

If you haven’t figured it out yet, a CC is needed to begin construction on your development. The certificate confirms that the construction plans and development specifications for your building design are consistent with the development consent outlined by the private certifier or council authority. It also confirms that the plans and specifications comply with the Building Code of Australia and any other specific council requirements (e.g. height restriction for your council area).

The CC also ensures that:

  • the conditions of the development consent that have to be complied with are met;
  • security listed as a condition of consent is provided;
  • monetary contributions that are needed as a condition of consent, have all been paid
  • structural strength and fire safety matters are met (this occurs with alterations to an existing structure);
  • the application has also been referred to the New South Wales Fire Brigade and that all issues raised have been taken into consideration or rectified

Is a CC mandatory?

Yes! If you plan on carrying out any type of building or construction work, a CC is necessary, Please note that development consent does not take the place of a CC. You cannot begin construction with solely development consent, you must acquire a CC.

The term “building work” is quite vague and does not give specific insight into when a CC is needed. According to NSW Fair Trading, residential building work refers to any work involved in constructing a dwelling, or altering or adding to a dwelling. It also includes repairing, renovating, applying a protective treatment to a dwelling. Therefore, if your scope of work falls into the above, then you must acquire a CC before you begin your project.

This is not to say that there are no exemptions to the rule. Like exempted developments do not need consent, some projects/works do not require a CC. This information can be found in the SEPP- State Environmental Planning Policy. There are many exemptions listed in this policy, however, if you are uncertain whether or not your project requires a CC, speak with a private certifier or your local council. For building works, feel free to get in touch with the ES Design team.

When do you have to apply for a Construction Certificate?

The timeline for applying for a CC is quite simple, however, you should bear in mind that you cannot apply for a CC before you have development consent. You can do either one of the following two options:

Apply for your CC after you have received development consent

Apply for your CC while you wait for your CDC or DA

With this option, your CC will only be issued after your project has received development consent. With regards to time, it does not make your CC progress any faster.

How do you apply for a CC?

Now that we have established a timeline for when you should apply for your CC, let’s take a look at how you should apply for it.

For a CC, you must apply to either your local council or an accredited certifier working in the private sector.

To apply for a CC, you will need to:

hold an approved development consent issued by your local council (or have it be in progress)

have met all the requirements and conditions that your local council placed upon your development consent

provide details of the work that you’d like to carry out for your projects. This may include technical specifications (e.g. contract requirements, descriptions of the quality required for certain works, product details, references to Australian Standards) and construction plans for the development (e.g. the method of construction, the structural system, the wall, floor and roof materials, the internal finishes for kitchens, bathrooms and other built-in joinery). Note: these documents may differ depending on the types of work that you want to carry out.

Once you have applied, it should take between 5 and 7 working days for your CC to be issued.

A CC is integral to beginning building works on your project. To acquire a CC, development consent is needed. If you’re familiar with regulations around the building, then you should know that getting development consent can be tricky and overwhelming. This is where the ES Design team can help. We will organise and submit applications for DA or a CDC, ensuring you have the best chance at success.

Your Source of Building design News and Information

Stay up to date with the latest industry news, including key changes to planning and design regulation. 

3 July, 2024
Local and state government performance to be tracked in bid to deliver housing targets

With the recent amendment to the State Environmental Planning Policy (Housing) 2021, NSW Government is committed to reaching the National Housing Accord target of 377,000 homes by mid-2029. In order to achieve this, the Minns Government is holding local and state governments accountable through a range of performance measures. The Housing SEPP amendment has brought …

1 July, 2024
Amendment to Housing SEPP to encourage low- and mid-rise housing in ‘well located areas’

In alignment with the National Housing Accord and following on from the proposal for low- and mid-rise reforms that went on exhibition from 15 December 2023 to 23 February 2024, NSW Government has introduced new amendments to the State Environmental Planning Policy (Housing) 2021. The aim of these reforms is to increase supply of low-rise …

15 December, 2023
Introducing the Mid Rise Housing Diversity Code

Today, the Department of Planning and Environment placed on exhibition a document to help accelerate housing delivery in NSW. This document suggests some changes to the low rise housing diversity code that impacts dual occupancies, manor houses and terraces but also brings in multi dwelling housing, residential flat buildings and shop top housing; all of …


Load more articles